Precautions for Installation of Concrete mixing Plant
What Should be Paid Attention to When Installing Concrete Mixing Plant? When installing a belt - type concrete mixing plant, the following precautions should be noted and corresponding mistakes should be avoided: Pre - installation Preparation - Site and Foundation Site Planning: It is necessary to fully consider the layout of each component of the mixing plant, including the running direction of the belt conveyor, the positions of the cement silo, mixer, etc. Ensure that the distance between the equipment is reasonable, which is convenient for raw material transportation and finished product output, and avoid potential operation inconvenience or safety hazards caused by insufficient space in the later stage. Foundation Construction: The foundation must be firm and level. Construction should be carried out in accordance with the design requirements to ensure that the bearing capacity of the foundation meets the equipment requirements. Avoid foundation settlement or uneven settlement, which may lead to equipment tilting, deformation or even damage. The dimensions, flatness, and positions of embedded parts of the foundation should be strictly inspected and verified. - Technology and Personnel Review...












